Weekly Ethereum Research Report (2026-05-11 ~ 2026-05-15)
TL;DR
- Bottom line: The Svalbard Interop wrap-up and EF blog accelerated the Glamsterdam spec-freeze flow, while Hegota was formalized as the next hard-fork track with EIP-7805 FOCIL as the CL Headliner.
- Numbers: From 5/11~5/15, 7 protocol calls were held; on 5/13, 6 calls overlapped; and the Reth peer ratio for Besu instances rose from ~75% to ~96% over 2 weeks.
- Action: Operators and researchers should track together the 5/18 close of 5 Lido Snapshots, 5/20 P2P Networking #1, 5/21 ACDE #237, and the Lido Tokenholder Update Call.
Top 3 Takeaways
-
The official Svalbard Interop wrap-up pulled Glamsterdam specs into freeze stage within a single week, and the "Hegotá" codename formally entered as the next hard fork. On 5/11, the ACDE #237 (5/21, 10 days ahead) agenda titled "Glam / Hegotá" exposed in advance a 90-minute call for simultaneous decisions on the two hard forks. On 5/12, the EF blog Protocol Cluster Updates: May 2026 officially bundled four decisions after a 9-day hiatus: FOCIL EIP-7805 Hegota CL Headliner confirmed + 200M Gas Limit Floor consensus + EIP-8037
fixed cost_per_state_byteadopted + Native AA scoping completed. The same day, commit ffebcbc batch-promoted the EIP-7773 Glamsterdam Meta to SFI (Scheduled for Inclusion) for 8 EL EIPs (EIP-7708 / EIP-7778 / EIP-7843 / EIP-7954 / EIP-7976 / EIP-7981 / EIP-8024 / EIP-8037). On 5/13, Glamsterdam Repricings #7 (14:00 UTC) was a spec-freeze decision call with the phrase "Final decision" stated twice, and 5 paired-spec burst commits for EIP-8037/EIP-8038 followed over the 2 hours and 47 minutes immediately before/after. This flow was a 3-day cycle from 5/10 CFI to 5/12 SFI to 5/13 Final Decision, compressing candidate-pool concretization through the spec-freeze stage into one week. On 5/14, ACDC #178 proceeded with two agenda items, "glam + hegotá", and became the official starting point for the transition from Glamsterdam to Hegotá by reaffirming EIP-7805 (FOCIL) as the Hegotá CL Headliner and formally discussing EIP-7716 (Correlated Downtime Penalties) and EIP-8205 (Validator Pre-registration) as Hegotá CL candidates. -
Two governance standardization tracks and one DVT permissionless-entry acceleration track appeared simultaneously in one week. On 5/11, the EIP-8261 "Gas Limit Schedule (
gpo)" proposal (eth-magicians 28494, bbusa) received an official EIP number on 5/13, within 24 hours. The proposal removes four mechanisms in one batch: validator "preferred gas limit" viaengine_forkchoiceUpdated, EL--miner.gaslimitflag, builder bidsgas_limit, and the EIP-1559 ±1/1024 per-block adjustment rule; it introduces thegpo<index>fork pattern (isomorphic to EIP-7892 BPO). As a result, it is a line that elevates the 200M Gas Limit Floor from a mere recommendation to a consensus-enforced parameter, while standardizing Curated Operator governance authority from Lido NOM governance into the ACD cycle. On 5/13, 5 Lido DAO Governance May 2026 Snapshots were proposed simultaneously (Lido X, 11:10 UTC), bundling NEST LDO automated buyback, CMv2 Node Operator Type Assessment Framework, GateSeals → CircuitBreaker permanence, Pier Two/MAVAN re-approval, and LOL Easy Track limit. The 5 votes close together at 5/18 16:00 UTC and align with the 5/21 Tokenholder Update Call result amplification, creating a formal standardization of Curated Operator entry assessment criteria + emergency-halt mechanism permanence narrative. The same day, Lido Research 11559 (GBeast) posted a proposal to add scoring sources to the SSV Community NO ICS framework: SSV pre-VO KYC grants +4 points to Proof of Humanity, and SSV High Signal score grants +2~5 points to Proof of Engagement. This means accelerated Lido CSM/ICS qualification for DVT operators and the first visibility of the Lido NO pool's triple-track governance structure (Curated v2 / CSM-ICS / SDVT). -
The week hit a peak of 7 calls plus 6 simultaneous calls on 5/13, but official notes are unpublished for all 7; meanwhile autonomous P2P topology drift and a 45-day client-release gap accumulated as infrastructure risk. From 5/11~5/15, 7 calls were held — ACDT #079, FCR #007, PQTS #008, Repricings #007, PQI #039, L1-zkEVM #004, and ACDC #178 — but 0 official notes were published (14 cumulative unpublished / longest ACDC #176 D+57). On 5/13, there were 6 calls on a single day, with 2 simultaneous 13:00 + 14:00 calls and 2 simultaneous 15:00 calls causing heavy listener fragmentation, while ACDE was absent (next ACDE #237 is 5/21). Stereum Labs 36-node fleet week-2 measurements (5/12 12:13 UTC, stefa2k) showed that, on the same EC/CC, same hardware, and same Reth release baseline, the Reth peer ratio for Besu instances autonomously accelerated from ~75% to ~96% (+21%p). Also visible were ~8x asymmetric over-representation versus Reth network share of ~12%, Reth fleet connected peer ~123 → ~69 (-44%), and tracked peer table ~7,400 → ~2,506 (-66%). This quantitatively exposed the limits of standard client-diversity metrics (node-count ratio) and aligns with the newly created 5/20 P2P Networking #1 (15:30 UTC) call as a signal that peer-link-unit entropy monitoring is needed. The EL/CL client release gap is now 45 days, with Geth v1.17.2 CVE-26313/26314/26315 and Lighthouse v8.1.3 state root 10x regression CRITICAL still unresolved. Through 5/14, EIP upgrade status data showed 11 consecutive days of rotating drift, and the recommendation to migrate
scripts/fetch_forkcast.pypagination remained cumulatively delayed.
1. Roadmap / Upgrade Change Highlights
Glamsterdam (CFI → SFI → Final Decision 3-day Cycle)
| Item | 5/11 (Mon) | 5/15 (Fri) | This Week's Change |
|---|---|---|---|
| EIP-7773 Glamsterdam Meta -- CFI listing | EIP-8246 listed as CFI via 5/10 commit e88ce59 | Single-item CFI listing at the start of this week | First formal CFI for The Purge SELFDESTRUCT cleanup / commit and ACDE #237 agenda posting occurred simultaneously 2 minutes apart |
| EIP-7773 -- SFI 8 EL Amsterdam EIPs | -- | 8 items batch-promoted via 5/12 commit ffebcbc | EIP-7708 / EIP-7778 / EIP-7843 / EIP-7954 / EIP-7976 / EIP-7981 / EIP-8024 / EIP-8037 -- single CFI → 8 SFIs within 24 hours |
| EIP-8037 (State Creation Gas Cost) | SFI candidate | 5/13 Repricings #7 Final Decision call held | "Final decision" phrasing stated twice / PR #11611 + #11616 / 5 paired-spec burst commits on 5/13 13:39~16:26 UTC (2 for 8037 + 2 for 8038 + 1 EIP-7851 tweaks) |
| EIP-8038 (new gas repricing track) | -- | Entered tracking via 2 commits on 5/13 | 85fe207(https://github.com/ethereum/EIPs/commit/85fe2077e4498e7d5c7fcf979961ad4aac8e6fbd) "Align with 8037 and clarify spec & rationale" + 391a31b(https://github.com/ethereum/EIPs/commit/391a31b38e933a30eca4dc8ad0e26f87cd42ae88) "Quick fixes" -- paired spec with EIP-8037 / dependency, complement, or replacement TBD |
| 200M Gas Limit Floor | -- | 5/12 EF blog formalized consensus | ~3.3~5.6x increase versus current ~36M~60M / convergence result of ePBS + BAL + EIP-8037 |
| ePBS (EIP-7732) multi-client devnet | -- | 5/12 EF blog + 5/14 ACDC #178 stable operation | External block builder process effectively completed end-to-end testing across all clients / mainnet activation ETA H1 2026 → Q3 2026 becoming realistic |
| EIP-7928 (BAL) bal-devnet-7 spec | -- | 5/11 ACDT #079 confirmation stage for reflecting EIP-8037 parameter update (PR #11616) + bugfix (PR #11611) | bal-devnet-7 v7.1.0 / REST SSZ EngineAPI Nethermind 5-10x performance improvement benchmark shared |
| EIP-8246 (Remove SELFDESTRUCT Burn) | CFI (meta EIP body) | 5/11 ACDT #079 discussion of inclusion in the next devnet | Follow-up to favorable response at ACDE #236 (5/7) / EIP-7708 simplification effect |
| EIP-8254 (Cap Deposit Requests per Block) | (new previous week) | 8192 cap per block (5/14 ACDC #178 follow-up decision not disclosed) | -- |
| EIP-8070 / EIP-8136 dependency | -- | 5/11 ACDT #079 EL-independent vs CL-first disagreement | EIP-8070 inclusion may be delayed |
| Engine API v2 + eth/70/71 | -- | 5/11 ACDT #079 SFI handling + execution-apis #796 (CL determines local gas limit) | -- |
Hegotá (Codename D-Day Appearance + CL Headliner Formally Confirmed)
| Item | 5/11 (Mon) | 5/15 (Fri) | This Week's Change |
|---|---|---|---|
| "Hegotá" codename | D-Day appearance on ACDE #237 agenda at 5/10 17:01 UTC (eth-magicians 28485) | 5/12 EF blog phrase "Hegotá foundational work" + 5/14 ACDC #178 "hegotá" as one of two agenda items | Deviation from city-name convention (Pectra/Fusaka/Glamsterdam) / etymology presumed Portuguese "already [completed/arrived]" (further verification needed) / next hard fork OR Glamsterdam follow-up stage |
| EIP-7805 (FOCIL) | -- | 5/12 EF blog + 5/14 ACDC #178 headliner reaffirmed | "FOCIL is scheduled for inclusion as a headliner on the CL side" / runnable implementation complete / censorship resistance strengthened |
| EIP-7716 (Correlated Downtime Penalties) | -- | 5/14 ACDC #178 Hegotá CL candidate discussion | Inclusion decision scheduled after PoC |
| EIP-8205 (Validator Pre-registration) | -- | 5/14 ACDC #178 Hegotá CL candidate discussion | Development in progress |
| Native Account Abstraction scoping | -- | 5/12 EF blog "Native account abstraction requirements scoped" | Possibility of defining a new Native AA line after EIP-7701 Withdrawn (merged 5/12 in the previous week) |
New Governance Standardization Tracks
| Item | 5/11 (Mon) | 5/15 (Fri) | This Week's Change |
|---|---|---|---|
EIP-8261 (Gas Limit Schedule, gpo) |
5/11 15:02 UTC EIP-Idea "gpo" (eth-magicians 28494, bbusa) | 5/13 official EIP-8261 number assigned | 24-hour promotion / batch removal of 4 mechanisms (validator engine_forkchoiceUpdated preferred gas limit + EL --miner.gaslimit + builder bids gas_limit + EIP-1559 ±1/1024 per-block) + gpo<index> fork pattern (isomorphic to EIP-7892 BPO) |
| EIP-8253 (Upgrade pre-Spurious-Dragon accounts) | -- | 5/12 09:20 UTC new listing (eth-magicians 28505, jochem-brouwer) | Replacement spec for EIP-7610 / batch bump of 24 mainnet pre-Spurious-Dragon account nonces → permanent state trie cleanup / The Purge track / Glamsterdam vs Hegota scope TBD |
AA Track + ECDSA Authority Deactivation (Paired Spec Stabilization)
| Item | This Week's Change |
|---|---|
| EIP-8141 (Frame Transaction) | 5/12 235d505 "Frames cleanup #11621" (lightclient) → 5/13 [#11652] "Support atomic batching with any frames" (Derek Chiang) -- AA UX complement by bundling multiple operations into a single transaction |
| EIP-8250 (Keyed Nonces for Frame Tx) | 5/12 326c463 new registration -- 192-bit key + 64-bit seq 2D nonce / Vitalik endorsed it as a "potential first foray into new state scaling strategy" (previous-week tracking line) |
| EIP-8130 (Casper FFG simplification / presumed PQ verifier) | 5/12 0aa63ce "Move from to sender" + 75eb6b4 "Add canonical verifier set" → 5/13 "Tighten verifier allowlist" + "Update gas and verifier validation" 2 commits -- yesterday's note hypothesis of a two-way AA headliner race is reinterpreted through the EF blog phrase "Native AA scoping", while EIP-8130 is a separate PQ verifier or Casper FFG simplification track |
| EIP-7851 + EIP-8151 (ECDSA Authority Deactivation pair) | 5/13 [#11652] follow-up "simplify ECDSA authority deactivation" (colin) + 43-minute-gap EIP-8151 "align ecRecover with EIP-7851" pair alignment → 5/14 3010b58 "Few tweaks to 7851 and 8151" -- simultaneous stabilization of 3 AA tracks |
Infrastructure / RPC / Other
- EIP-7594 PeerDAS Cell-level deltas + EIP-8070 eth/72 Sparse blobpool + Ethp2p updates -- the three sessions in the newly created 5/20 P2P Networking #1 (15:30 UTC) call (eth-magicians 28500) are a signal that the specialized P2P layer track is becoming independent
- RPC Standards #26 (5/18 15:00 UTC) newly registered (eth-magicians 28522) -- (a)
eth_simulateV1error handling relaxation, (b)debug_getRawTransactionstandardization (PR #791), (c) uncle count method removal (eth_getUncleCountByBlockHash/eth_getUncleCountByBlockNumber, Breaking Change preview), (d) EIP-7910 agenda - EIP-8025 L1-zkEVM implementation update -- Prysm implementation progress + 7 project presentations + zkVM input deserialization at the 5/13 L1-zkEVM Breakout #004
- ERC-8259 AI Agent Identity Draft v2 -- new at 5/13 10:26 UTC (eth-magicians 28521) / ERC for AI agent identity, reputation, and threat signals / indirect alignment with The Splurge UX track
- BondRoute "Application-Layer Execution Bonds" -- new ethereum-magicians discussion on 5/11 / bond + slashing-based solver guarantee mechanism / critique of trust boundaries in existing MEV defenses (private mempool / relay / solver)
2. EIP Status Changes (Monday vs Friday)
Data Integrity Warning (LEVEL 3+ accumulated for 12 days): From 5/4~5/14, forkcast snapshots maintained a 246-item quota for 11 consecutive days while 1~4 EIPs rotated in/out daily (rotating snapshot drift). The EIP-5920 PAY opcode toggled 6 times over 11 days (average 1.8-day cycle). Hypothesis: the forkcast repo
src/data/eipsdirectory has more than 246 files, and a single GitHub/contentsAPI call is truncated to the first ≈246, returning a different EIP set each day. Migration ofscripts/fetch_forkcast.pyto pagination (per_page=100+pageloop) or the Trees API (/git/trees/{sha}?recursive=1) has been delayed by 5 days. Forkcast citations in this section trust only results cross-verified across four sources: ACD call notes + GitHub commits + ethereum-magicians discussions + EF blog. Mainnet Final facts are unchanged (EIP-2537 / EIP-2935 Pectra Included + EIP-4844 Dencun Included remain).
5/11 → 5/15 forkcast Snapshot Toggle (Single-File Diff)
| Hard Fork / Stage | Added | Removed |
|---|---|---|
| Pectra Included | -- | EIP-6110 |
| Glamsterdam Declined | -- | EIP-6404 / EIP-6466 |
| Glamsterdam Considered | -- (1 maintained: EIP-2780) | -- |
| Fusaka Declined | -- (5 maintained: 5 EOF items) | -- |
| Dencun Included | -- (1 maintained: EIP-4844) | -- |
The single-date diff looks small, but the daily toggle pattern was violent (5/11 EIP-4750/6110/6404/6466 returned + 6206 disappeared → 5/12 6110 disappeared again + 5920 appeared on both sides → 5/13 5450+5920 disappeared simultaneously + EOF 5 items → narrowed to 4 items → 5/14 5920/6466 both returned + 3-item window re-expanded). Looking only at diffs between the two ends of each week captures less than 1/10 of the truncate-window deviation. It must be read together with the daily toggle matrix (see daily briefing section) to be coherent.
Trustworthy Changes (Calls / Commits / EF Blog 4-way Cross-verification)
EIP-7773 Glamsterdam Meta SFI Promotion of 8 Items (5/12 commit ffebcbc)
- EIP-7708 (ETH transfer logs) -- impact on standardizing Lido contract stETH transfer events
- EIP-7778 (Block Gas Accounting without Refunds) -- direct impact on MEV builder/relay revenue models through removal of gas refunds
- EIP-7843 (SLOTNUM opcode) -- exposes slot number to the EVM
- EIP-7954 (Maximum Contract Size increase) -- candidate impact on stETH contract upgrades (current limit 24,576 bytes)
- EIP-7976 (Calldata Floor Cost increase) -- strengthens blob usage incentives
- EIP-7981 (Access List Cost increase)
- EIP-8024 (SWAPN/DUPN/EXCHANGE backward-compatible)
- EIP-8037 (State Creation Gas Cost Increase) -- 5/13 Repricings #7 Final Decision track
New Registration / Official Number Assignment
- EIP-8253 (Upgrade pre-Spurious-Dragon accounts, 5/12 09:20 UTC, jochem-brouwer) -- replacement for EIP-7610 / The Purge
- EIP-8261 (Gas Limit Schedule
gpo, official number assigned 5/13 / posted as an EIP-Idea on 5/11) -- removes 4 mechanisms - EIP-8038 (paired spec, entered commit tracking on 5/13) -- "Align with 8037" message
- EIP-8141 (Frame Transaction, atomic batching added 5/13)
- EIP-8250 (Keyed Nonces, 5/12 commit 326c463)
Status / Meta EIP Body-level Listings
- EIP-7805 (FOCIL) -- Hegota CL Headliner formally confirmed (5/12 EF blog + 5/14 ACDC #178)
- EIP-7716 / EIP-8205 -- entered as Hegota CL candidates (5/14 ACDC #178)
- EIP-8246 -- listed as CFI in the EIP-7773 Meta (5/10 e88ce59)
- EIP-8037 / EIP-8038 -- Final Decision decision call (5/13 Repricings #7)
- ERC-4337 -- Last Call (entered D-4 to possible 5/19 Final point, previous-week track)
3. Validator / Infrastructure Key Issues
5 Lido May 2026 Snapshots Proposed Simultaneously (5/13 11:10 UTC) -- Peak Governance Standardization Day
- 5 votes proposed in batch (Lido X main thread): (1) NEST: Automated LDO Buyback and Liquidity Provisioning (Lido protocol revenue → automated LDO buyback + liquidity provisioning), (2) Adopt the Node Operator Type Assessment Framework for CMv2 (formal standardization of Curated Operator entry assessment criteria by DAO approval of the NO classification system for formal CMv2 entry), (3) Transition from GateSeals to CircuitBreaker (temporary emergency halt renewed annually → institutional operational-risk simplification narrative through permanent contract standardization), (4) Pier Two Participation in Curated Module and SDVT (MAVAN, formerly Pier Two, re-approved for Curated + SDVT), (5) Increase Easy Track Transfer Limits for LOL to Align with EGG.
- May governance 7-day window: 5/13 (proposal) → 5/18 16:00 UTC (batch close) → 5/21 14:00 UTC (alignment with Tokenholder Update Call result amplification). Core for Curated Operators: if (2) CMv2 NO Type Assessment Framework passes on 5/18, entry-material v2 drafting ETA 5/18~5/21 + integrate the (3) GateSeals → CircuitBreaker permanence narrative into entry materials.
SSV Community NO ICS Framework Additional Scoring Proposal (5/13 14:06 UTC) -- DVT Permissionless-Entry Acceleration Track
- Lido Research 11559 (GBeast). Original quote: "Add a new score source: SSV pre-VO KYC to Proof of Humanity category [4 points] / Add a new score source: SSV High Signal score to Proof of Engagement [2 - 5 points]".
- Across the three stages ICS (Identified Community Staker) / VO (Verified Operator) / CSM (Community Staking Module), SSV community NOs obtain ICS eligibility faster through their own KYC bonus and operational reliability bonus. This leads to Lido NO pool decentralization + lower dependence on permissioning + improved DVT operator ROI.
- First visibility of the Lido NO pool's triple-track governance structure: (a) Curated Module v2 (permissioned + Type Assessment Framework standardization), (b) CSM-ICS (permissionless score accumulation + DVT acceleration), (c) SDVT (permissioned DVT) = new NO entrants can choose the track that matches their infrastructure/organizational structure.
Existing A41 / SSV DVT Tracks + Remaining EarnETH Incident
- Previous week's 5/7 A41 ~7,000 validator Exit case study (Lido X 7-tweet campaign) entered full amplification stage this week = Curated Operator wind-down SOP 4.4x reduction (Organic 78 ETH → Scheduled/Batched 17.64 ETH) standardization material is now available for cumulative use in the weekly narrative.
- SSV Network Anchor client Lido mainnet recommendation (previous week 5/4) naturally aligns with this week's SSV Community NO ICS framework proposal = SSV track expands bidirectionally through Curated Module + Simple DVT Module mainnet recommendation + permissionless CSM track acceleration.
- EarnETH Vault withdrawal halt, day 22 (as of 5/14, D+7 static) -- freeze started 4/22 / "in the near future" (5/7 Lido X) ETA static at D+7 / entering the limit as the second week of May close (5/16) approaches / 5/15 (Fri) Lido content-cycle next-announcement candidate window + possible EarnETH ETA alignment (not disclosed at the time of this report).
- Lido Tokenholder Update Call (5/21 14:00 UTC) pre-announced at Lido Research 11551 / lineup @_vshapovalov + @zuzu_eeka + @IsdrsP (Chief of Staking). It conflicts with ACDE #237 (90 minutes) in the same 14:00 UTC time slot, so monitoring the presentation order is key.
- Credora @bvicentes stETH resilience amplification (5/13 15:52 UTC) distributed via a Lido X Poolside Institutional full video the analysis that "stETH has superior resilience versus recent DeFi exploit waves through 1:1 algorithmic minting + industry-leading timelock protection." It pushed the institutional narrative and governance narrative simultaneously.
EL Peer Composition Drift Week-2 Measurement -- Quantitative Exposure of Client Diversity Metric Limits
- Stereum Labs 36-node fleet analysis (5/12 12:13 UTC, stefa2k). On the same EC/CC + same hardware + same Reth release baseline: (a) Besu node Reth peer concentration ~75% → ~96% (+21%p / week 2), (b) ~96% versus Reth network share of ~12% = ~8x asymmetric over-representation, (c) Reth fleet connected peer ~123 → ~69 (-44%), (d) Reth fleet tracked peer table ~7,400 → ~2,506 (-66%).
- Implication: standard client diversity metrics (node-count ratio / clientdiversity.org) only partially reflect actual P2P topology safety, so peer-link-unit entropy measurement is needed. Besu operator P2P isolation risk arises at 96% Reth peer concentration. If a Reth client bug occurs, the Besu fleet could also be affected, partly neutralizing the original purpose of client diversity.
- It potentially aligns with the 5/20 P2P Networking #1 call agenda (Cell-level deltas + Sparse blobpool + Ethp2p), and could become a core follow-up discussion call.
Continuing Client / Infrastructure Risks
- EL/CL client release gap at day 45: Geth v1.17.2 (CVE-26313/26314/26315 RPC +
debug_executionWitnessstate corruption) + Lighthouse v8.1.3 (state root 10x regression + P2P security) CRITICAL advisories unresolved for 45 days. 5/5 Nethermind v1.37.2 (Breaking eth/66/67 drop) + 4/30 Reth v2.2.0 (Discv5 enabled by default) major changes remain cumulatively static. - 200M Gas Limit Floor consensus + ePBS multi-client verification complete means a ~3.3~5.6x increase versus current ~36M~60M. Curated Operators should set a 6~12 month ETA for CPU/RAM/NVMe SSD/network upgrades. If EIP-8261 (
gpofork pattern) activates, gas-limit decision authority is standardized from NOM governance into the ACD cycle.
4. Protocol Call Key Decisions
Source: output/notes/protocol-calls/2026-05-15-weekly-call-summary.md (7 total calls, 0 official notes published, organized from agendas and context)
This Week's Call List (Total 7)
| Date | Call | Number | Key Topic | Status |
|---|---|---|---|---|
| 5/11 (Mon) 14:00 UTC | ACDT — All Core Devs Testing | #079 | Interop result sharing / Glamsterdam devnet-1 spec / EIP-8246 devnet inclusion discussion / EIP-7928 BAL-devnet-7 confirmation / EIP-8070 vs EIP-8136 dependency / eth/70 eth/71 SFI / REST SSZ EngineAPI 5-10x | Notes unpublished |
| 5/12 (Tue) 12:00 UTC | FCR — Fast Confirmation Rule | #007 | Client / Spec / Research / Testing updates | Notes unpublished |
| 5/13 (Wed) 13:00 UTC | PQTS — Post Quantum Tx Signature | #008 | conduition presentation "Pruning Hypertrees for the Lax and Lazy" | Notes unpublished |
| 5/13 (Wed) 14:00 UTC | Glamsterdam Repricings | #007 | EIP-8037 Final Decision (PR #11611 + #11616) + bal-devnet-7 v7.1.0 + EIP-2780 TX_BASE_COST benchmarking + EIP-8038 devnet inclusion | Notes unpublished |
| 5/13 (Wed) 14:00 UTC | PQI — Post-Quantum Interop | #039 | Devnet-5 direction / 3SF mini vs Goldfish / leanSpec stabilization / cryptography-specs | Notes unpublished |
| 5/13 (Wed) 15:00 UTC | L1-zkEVM Breakout | #004 | EIP-8025 Prysm implementation update + 7 project presentations + zkVM input deserialization | Notes unpublished |
| 5/14 (Thu) 14:00 UTC | ACDC — All Core Devs Consensus | #178 | glam + hegotá 2-item agenda / EIP-7805 FOCIL Hegotá CL Headliner reaffirmed / EIP-7716 / EIP-8205 candidate discussion | Notes unpublished |
Note: 4 calls on a single date, 5/13 (Wed), with 2 simultaneous starts at 14:00 UTC and 2 simultaneous starts at 15:00 UTC = peak listener fragmentation. ACDE call absent (next ACDE #237 is 5/21).
Key Decision Summary
-
ACDC #178 is the official starting point of the Glamsterdam → Hegotá transition. The agenda structure itself was split into two items ("glam" + "hegotá"), and EIP-7805 FOCIL was effectively reaffirmed as the Hegotá CL headliner. EIP-7716 (Correlated Downtime Penalties, inclusion after PoC) + EIP-8205 (Validator Pre-registration, development in progress) Hegotá CL candidates were also discussed in earnest, resolving the 27-day ACDC non-registration critical path.
-
ACDT #079 is the Glamsterdam devnet-1 + bal-devnet-7 confirmation stage. It covered the Interop event (4/24~30) result summary, discussion of including EIP-8246 (Remove SELFDESTRUCT Burn) in the next devnet (follow-up to favorable ACDE #236 response), EIP-7928 BAL-devnet-7 v7.1.0, reflecting EIP-8037 PR #11616/#11611, REST SSZ EngineAPI Nethermind 5-10x performance improvement, and the proposal for the CL to determine the local gas limit (execution-apis #796). The EIP-8070 vs EIP-8136 dependency remains unresolved.
-
Repricings #7 is the decision call for EIP-8037 spec freeze. The agenda stated the phrase "Final decision" twice. The key items were a bal-devnet-7 (v7.1.0)-based single cost parameter, direct benchmarking of EIP-2780 TX_BASE_COST, and whether to include EIP-8038 in the devnet. Official notes are unpublished, but a 5-commit burst in the 13:39~16:26 UTC window (2 for 8037 + 2 for 8038 + 1 for 7851) is an alignment signal for the presumed merge of PR #11616 + #11611 and the spec-freeze result.
-
Cumulative 14 unpublished official notes (D+1 ~ D+57) -- ACDC #176 (D+57) / ACDE #233 (D+50) / ACDE #234 (D+36) / ACDC #177 (D+29) / ACDE #235 (D+22) / PQI #038 (D+9) / ACDE #236 (D+8) / ACDT #079 (D+4) / FCR #007 (D+3) / PQTS #008 (D+2) / Repricings #007 (D+2) / PQI #039 (D+2) / L1-zkEVM #004 (D+2) / ACDC #178 (D+1). The key monitoring point is whether the official-note publication delay is resolved in batch during the 5/18 (ACDT #080) or 5/21 (ACDE #237) window.
5. This Week's Recommended Topic Status + Priority Drafting Target Selection
Daily Recommendations (Topic Recommender)
| Date | Recommendation 1 | Recommendation 2 | Score |
|---|---|---|---|
| 5/11 | 'Hegotá' new codename + ACDE #237 90-minute agenda -- simultaneous decision call for two hard forks + deviation from city-name convention | CFI in the Meta EIP body vs forkcast Considered -- Glamsterdam governance-alignment structure through the EIP-7773 → EIP-8246 CFI case + The Purge SELFDESTRUCT cleanup track | 0.902 / 0.898 |
| 5/13 | EIP-8261 (Gas Limit Schedule) 24h promotion -- simultaneous removal of 4 tracks: validator preferred gas limit + EIP-1559 ±1/1024 + EL --miner.gaslimit + builder bids gas_limit |
36-node fleet 2-week P2P drift measurement -- Besu→Reth ~75% → ~96% + blind spot in standard client-diversity metrics + peer-link entropy monitoring paradigm | 0.87 / 0.86 |
| 5/14 | Lido May 2026 Snapshot 5 D-4 -- CMv2 NO Type Assessment Framework + GateSeals→CircuitBreaker + Pier Two/MAVAN re-approval + 5/18~5/21 7-day governance-peak window | SSV Community NO ICS framework additional scoring -- DVT operator ROI equation + first visibility of Lido NO pool triple-track (Curated v2 / CSM-ICS / SDVT) governance structure | 0.92 / 0.91 |
Priority Drafting Targets (Top 3)
-
[5/14 Recommendation 1, score 0.92] Lido May 2026 Snapshot 5 D-4 -- CMv2 NO Type Assessment Framework Standardization + GateSeals → CircuitBreaker Permanence -- category: issue, length 4,500~5,500 characters.
- Reason: (i) secures a solo insight window 4 days before the deadline in the concentrated 7-day governance window from 5/13 proposal → 5/18 16:00 UTC batch close → 5/21 14:00 UTC Tokenholder Call (0 external media analyses), (ii) if the CMv2 NO Type Assessment Framework passes, formal standardization of Curated Operator entry assessment criteria and entry-material v2 drafting ETA 5/18~5/21, (iii) GateSeals → CircuitBreaker permanence lets the institutional operational-risk simplification narrative be integrated into the package of 4 external attestations (StakingRewards A+ + Credora A+ + Bluechip A+ + Cantina Web3SOC) + 3 custody providers (BitGo + Fireblocks + Copper).
- Differentiation: 0 Korean materials + 0 standalone English analyses after the 5/13 proposal + integrated narrative analysis of the May governance burst.
-
[5/14 Recommendation 2, score 0.91] SSV Community NO ICS Framework Additional Scoring -- DVT Operator ROI Equation + First Visibility of Lido NO Pool Triple-Track Governance Structure -- category: article, length 5,000~6,000 characters.
- Reason: A solo insight window opened because there were 0 external responses/comments as of 2 days after GBeast posted Lido Research 11559 on 5/13 14:06 UTC. Formal listing of the accelerated Lido CSM/ICS entry track for DVT (SSV) operators is the first case where DVT infrastructure investment directly converts into Lido entry bonus points. Visualization of the Lido NO pool triple-track structure (Curated v2 / CSM-ICS / SDVT) is absent in both Korean and English.
- Differentiation: Can be structured as a series with Recommendation 1 (Recommendation 1 is governance standardization, Recommendation 2 is the DVT permissionless-entry track; together they form the Lido NO pool triple structure).
-
[5/11 Recommendation 1, score 0.902] 'Hegotá' New Codename + ACDE #237 (5/21, D-6) 90-minute Agenda -- category: issue, length 4,500~5,500 characters.
- Reason: The codename's position (next hard fork) was formally confirmed by the 5/12 EF blog phrase "Hegotá foundational work" and the 5/14 ACDC #178 "hegotá" agenda entry. The 5/21 ACDE #237 D-6 point maximizes advance-coordinate value and enables a follow-up comment note publication plan before/after the decision call. Deviation from city-name convention + AA track unification decision + Glamsterdam CFI/Considered candidate batch-decision scenario.
- Differentiation: 0 Korean analyses + evaluation of the effect of AA track unification on Lido validators (key management and delegation structure).
Series Continuity Recommendation: Build a serial series with Recommendation 1 (governance standardization) + Recommendation 2 (DVT permissionless-entry track), and explicitly link it to the 5/9 Lido EEA Treasury 5-way due-diligence package narrative to secure series continuity. The 5/18 Snapshot result + 5/21 Tokenholder Call result naturally align as v2 update windows for these recommended articles.
6. Next Week's Major Schedule (2026-05-18 ~ 2026-05-22)
Protocol Calls
| Date | Call | Number | Key Observation Point |
|---|---|---|---|
| 5/18 (Mon) 14:00 UTC | ACDT — All Core Devs Testing | #080 (estimated) | Glamsterdam devnet updates + spec next devnet / whether EIP-8246 devnet-1 inclusion is confirmed / reflection of EIP-8037 Final Decision result / bal-devnet-7 official launch ETA |
| 5/18 (Mon) 15:00 UTC | RPC Standards | #026 | eth_simulateV1 error handling relaxation + debug_getRawTransaction standardization (PR #791) + uncle count method removal (Breaking Change preview) + EIP-7910 agenda |
| 5/20 (Wed) 15:30 UTC | P2P Networking | #001 (new) | Cell-level deltas (@MarcoPolo / PeerDAS) + Sparse blobpool (@healthykim, @kamilsa / EIP-8070 eth/72) + Ethp2p updates (@raulk) -- possible core follow-up call for EL peer drift |
| 5/21 (Thu) 14:00 UTC | ACDE — All Core Devs Execution | #237 (90 minutes) | Agenda "Glam + Hegotá" -- final decision moving 8 SFI EIPs Scheduled → Included + official disclosure of Hegotá definition + AA track unification (EIP-8141 vs EIP-8130 vs EIP-7851/EIP-8151) |
| 5/26 (Tue) | FCR — Fast Confirmation Rule | #008 (estimated) | Client / Spec / Research / Testing updates |
Devnet / Spec Milestones
- Whether Glamsterdam devnet-1 launches immediately after 5/18 ACDT #080 -- bal-devnet-7 v7.1.0 + EIP-8037 Final Decision result reflected
- bal-devnet-7 → bal-devnet-8 transition -- whether EIP-8038 is included in the devnet + EIP-2780 TX_BASE_COST benchmarking result
- Whether PQ Devnet-5 proceeds -- PQI #039 (5/13) result undisclosed / awaiting conclusion on 3SF mini vs Goldfish
Governance / Operations
- 5/18 16:00 UTC batch close of 5 Lido Snapshots -- CMv2 NO Type Assessment Framework + GateSeals → CircuitBreaker + Pier Two/MAVAN re-approval + NEST LDO buyback + LOL Easy Track limit. If passed, entry-material v2 drafting ETA 5/18~5/21.
- 5/19 ERC-4337 possible Final point -- Last Call 14-day window ends (previous week 5/5 → 5/19). Monitor PR #1640 merge timing.
- 5/21 14:00 UTC ACDE #237 + Lido Tokenholder Update Call simultaneous progress -- same-time-slot conflict. Lido lineup @_vshapovalov + @zuzu_eeka + @IsdrsP (Chief of Staking) / four scenarios for "what's next" phrasing = (a) next institutional ETH treasury case, (b) new Curated Operator vacancy/rotation, (c) V3 stVaults progress, (d) NOM governance change.
- EarnETH Vault freeze release ETA -- "in the near future" D+8 (as of 5/15) / presumed limit for ETA disclosure before entering week 4 (5/19).
Official Note Publication Delay Batch Resolution Monitoring
ACDC #176 (D+57) / ACDE #233 (D+50) / ACDE #234 (D+36) / ACDC #177 (D+29) / ACDE #235 (D+22) / PQI #038 (D+9) / ACDE #236 (D+8) / ACDT #079 (D+4) / FCR #007 (D+3) / PQTS #008 (D+2) / Repricings #007 (D+2) / PQI #039 (D+2) / L1-zkEVM #004 (D+2) / ACDC #178 (D+1) -- possibility of batch publication immediately after the 5/18~5/21 call window. Immediately read the full text of the Repricings #007 EIP-8037 Final Decision result + ACDC #178 Hegotá scoping consensus.
Technical Risk Monitoring
- Client release gap day 45 → entering the 50-day range -- nodes with unresolved Geth v1.17.2 + Lighthouse v8.1.3 CRITICAL advisories need immediate patching or external RPC deactivation. After ACDT #080 (5/18), monitor GitHub Releases for EL/CL releases supporting Glamsterdam devnet-1 (EIP-8037/EIP-7928 BAL/EIP-8246 implementation tags).
- EIP upgrade status (forkcast) data integrity LEVEL 3+ accumulated for 12 days -- migration of
scripts/fetch_forkcast.pyto pagination or Trees API is delayed by 5 days / directly count actual file count in forkcast repo src/data/eips directory (hypothesis 300~500). - EL peer composition drift monitoring -- Besu operators should immediately check
admin_peersor metrics SOP / take peer-diversity measures if Reth peer ratio is 80%+. Monitoring the 5/20 P2P Networking #1 result is key.
Related Entities
EIP-1559, EIP-2780, EIP-4844, EIP-5920, EIP-6110, EIP-6404, EIP-6466, EIP-7251, EIP-7594, EIP-7610, EIP-7708, EIP-7716, EIP-7732, EIP-7773, EIP-7778, EIP-7805, EIP-7843, EIP-7851, EIP-7892, EIP-7910, EIP-7928, EIP-7954, EIP-7976, EIP-7981, EIP-8024, EIP-8025, EIP-8037, EIP-8038, EIP-8070, EIP-8130, EIP-8136, EIP-8141, EIP-8151, EIP-8205, EIP-8246, EIP-8250, EIP-8253, EIP-8254, EIP-8259, EIP-8261.
Reference Sources
Daily Briefings
- 2026-05-11 Daily Briefing -- ACDE #237 (5/21, D-10) "Glam / Hegotá" 90-minute agenda disclosed + EIP-7773 CFI EIP-8246 official listing
- 2026-05-12 Daily Briefing -- Svalbard Interop official wrap-up (EF blog ends 9-day hiatus) + EIP-7773 SFI promotion of 8 EL EIPs + EIP-8261 (gpo) new proposal + Lido Tokenholder Call (5/21) announcement
- 2026-05-13 Daily Briefing -- Glamsterdam Repricings #7 D-Day + EIP-8037 Final Decision + 5 calls on a single date + official numbers for EIP-8253 / EIP-8261 + EL peer drift 36-node fleet measurement
- 2026-05-14 Daily Briefing -- Repricings #7 D+1 paired-spec burst of 5 commits + Lido May 2026 Snapshot 5 D-4 + SSV Community NO ICS framework newly listed + RPC Standards #26 (5/18 uncle method removal agenda)
Protocol Calls / Recommendations
- 2026-05-15 Protocol Call Weekly Summary -- ACDT #079 + FCR #007 + PQTS #008 + Repricings #007 + PQI #039 + L1-zkEVM #004 + ACDC #178 (7 calls / 0 official notes)
- 2026-05-14 Daily Recommendations -- Lido May 2026 Snapshot 5 (0.92) + SSV Community NO ICS DVT ROI (0.91)
- 2026-05-13 Daily Recommendations -- EIP-8261 4-track signal (0.87) + 36-node fleet P2P drift entropy (0.86)
- 2026-05-11 Daily Recommendations -- Hegotá ACDE #237 (0.902) + Meta EIP CFI mechanism (0.898)
Core External Sources
- Ethereum Foundation Blog -- Protocol Cluster Updates: May 2026 (5/11) -- Svalbard Interop official wrap-up / FOCIL Hegotá CL Headliner + 200M Gas Limit Floor + EIP-8037 fixed cost_per_state_byte + Native AA scoping
- ethereum-magicians 28485 -- ACDE #237 (5/21, 90 minutes, Glam + Hegotá)
- ethereum-magicians 28494 -- EIP-8261 Gas Limit Schedule (gpo)
- ethereum-magicians 28505 -- EIP-8253 Upgrade pre-Spurious-Dragon accounts
- ethereum-magicians 28497 -- Glamsterdam Repricings #7 (5/13)
- ethereum-magicians 28522 -- RPC Standards #26 (5/18)
- ethereum-magicians 28500 -- P2P Networking #1 (5/20, new)
- ethresear.ch 24857 -- EL peer composition drifts (Stereum Labs 36-node, week 2)
- Lido X -- May 2026 Snapshot 5 simultaneous proposal thread
- Lido Research 11559 -- SSV Community NO ICS framework additional scoring proposal (GBeast)
- Lido Research 11551 -- Lido Tokenholder Update Call (5/21)
Previous Weekly Report
- 2026-05-08 Weekly Report -- Lido institutional due-diligence full-stack lifecycle + Glamsterdam SFI 8 EIPs (ACDE #236) + The Purge decision-pressure peak (5/7 trio)
Written by: @r2jamong | 2026-05-15 (Friday ACDC #178 D+1 · weekly synthesis report · ACDE #237 D-6 · Lido Snapshot 5 close D-3 · Lido Tokenholder Update Call D-6)