Archived content — no longer updated since July 2026. See Reports for the latest research.
← Archive

May 2026 — Week 3

· @r2jamong .md

Weekly Ethereum Research Report (2026-05-11 ~ 2026-05-15)

TL;DR

  • Bottom line: The Svalbard Interop wrap-up and EF blog accelerated the Glamsterdam spec-freeze flow, while Hegota was formalized as the next hard-fork track with EIP-7805 FOCIL as the CL Headliner.
  • Numbers: From 5/11~5/15, 7 protocol calls were held; on 5/13, 6 calls overlapped; and the Reth peer ratio for Besu instances rose from ~75% to ~96% over 2 weeks.
  • Action: Operators and researchers should track together the 5/18 close of 5 Lido Snapshots, 5/20 P2P Networking #1, 5/21 ACDE #237, and the Lido Tokenholder Update Call.

Top 3 Takeaways

  1. The official Svalbard Interop wrap-up pulled Glamsterdam specs into freeze stage within a single week, and the "Hegotá" codename formally entered as the next hard fork. On 5/11, the ACDE #237 (5/21, 10 days ahead) agenda titled "Glam / Hegotá" exposed in advance a 90-minute call for simultaneous decisions on the two hard forks. On 5/12, the EF blog Protocol Cluster Updates: May 2026 officially bundled four decisions after a 9-day hiatus: FOCIL EIP-7805 Hegota CL Headliner confirmed + 200M Gas Limit Floor consensus + EIP-8037 fixed cost_per_state_byte adopted + Native AA scoping completed. The same day, commit ffebcbc batch-promoted the EIP-7773 Glamsterdam Meta to SFI (Scheduled for Inclusion) for 8 EL EIPs (EIP-7708 / EIP-7778 / EIP-7843 / EIP-7954 / EIP-7976 / EIP-7981 / EIP-8024 / EIP-8037). On 5/13, Glamsterdam Repricings #7 (14:00 UTC) was a spec-freeze decision call with the phrase "Final decision" stated twice, and 5 paired-spec burst commits for EIP-8037/EIP-8038 followed over the 2 hours and 47 minutes immediately before/after. This flow was a 3-day cycle from 5/10 CFI to 5/12 SFI to 5/13 Final Decision, compressing candidate-pool concretization through the spec-freeze stage into one week. On 5/14, ACDC #178 proceeded with two agenda items, "glam + hegotá", and became the official starting point for the transition from Glamsterdam to Hegotá by reaffirming EIP-7805 (FOCIL) as the Hegotá CL Headliner and formally discussing EIP-7716 (Correlated Downtime Penalties) and EIP-8205 (Validator Pre-registration) as Hegotá CL candidates.

  2. Two governance standardization tracks and one DVT permissionless-entry acceleration track appeared simultaneously in one week. On 5/11, the EIP-8261 "Gas Limit Schedule (gpo)" proposal (eth-magicians 28494, bbusa) received an official EIP number on 5/13, within 24 hours. The proposal removes four mechanisms in one batch: validator "preferred gas limit" via engine_forkchoiceUpdated, EL --miner.gaslimit flag, builder bids gas_limit, and the EIP-1559 ±1/1024 per-block adjustment rule; it introduces the gpo<index> fork pattern (isomorphic to EIP-7892 BPO). As a result, it is a line that elevates the 200M Gas Limit Floor from a mere recommendation to a consensus-enforced parameter, while standardizing Curated Operator governance authority from Lido NOM governance into the ACD cycle. On 5/13, 5 Lido DAO Governance May 2026 Snapshots were proposed simultaneously (Lido X, 11:10 UTC), bundling NEST LDO automated buyback, CMv2 Node Operator Type Assessment Framework, GateSeals → CircuitBreaker permanence, Pier Two/MAVAN re-approval, and LOL Easy Track limit. The 5 votes close together at 5/18 16:00 UTC and align with the 5/21 Tokenholder Update Call result amplification, creating a formal standardization of Curated Operator entry assessment criteria + emergency-halt mechanism permanence narrative. The same day, Lido Research 11559 (GBeast) posted a proposal to add scoring sources to the SSV Community NO ICS framework: SSV pre-VO KYC grants +4 points to Proof of Humanity, and SSV High Signal score grants +2~5 points to Proof of Engagement. This means accelerated Lido CSM/ICS qualification for DVT operators and the first visibility of the Lido NO pool's triple-track governance structure (Curated v2 / CSM-ICS / SDVT).

  3. The week hit a peak of 7 calls plus 6 simultaneous calls on 5/13, but official notes are unpublished for all 7; meanwhile autonomous P2P topology drift and a 45-day client-release gap accumulated as infrastructure risk. From 5/11~5/15, 7 calls were held — ACDT #079, FCR #007, PQTS #008, Repricings #007, PQI #039, L1-zkEVM #004, and ACDC #178 — but 0 official notes were published (14 cumulative unpublished / longest ACDC #176 D+57). On 5/13, there were 6 calls on a single day, with 2 simultaneous 13:00 + 14:00 calls and 2 simultaneous 15:00 calls causing heavy listener fragmentation, while ACDE was absent (next ACDE #237 is 5/21). Stereum Labs 36-node fleet week-2 measurements (5/12 12:13 UTC, stefa2k) showed that, on the same EC/CC, same hardware, and same Reth release baseline, the Reth peer ratio for Besu instances autonomously accelerated from ~75% to ~96% (+21%p). Also visible were ~8x asymmetric over-representation versus Reth network share of ~12%, Reth fleet connected peer ~123 → ~69 (-44%), and tracked peer table ~7,400 → ~2,506 (-66%). This quantitatively exposed the limits of standard client-diversity metrics (node-count ratio) and aligns with the newly created 5/20 P2P Networking #1 (15:30 UTC) call as a signal that peer-link-unit entropy monitoring is needed. The EL/CL client release gap is now 45 days, with Geth v1.17.2 CVE-26313/26314/26315 and Lighthouse v8.1.3 state root 10x regression CRITICAL still unresolved. Through 5/14, EIP upgrade status data showed 11 consecutive days of rotating drift, and the recommendation to migrate scripts/fetch_forkcast.py pagination remained cumulatively delayed.


1. Roadmap / Upgrade Change Highlights

Glamsterdam (CFI → SFI → Final Decision 3-day Cycle)

Item 5/11 (Mon) 5/15 (Fri) This Week's Change
EIP-7773 Glamsterdam Meta -- CFI listing EIP-8246 listed as CFI via 5/10 commit e88ce59 Single-item CFI listing at the start of this week First formal CFI for The Purge SELFDESTRUCT cleanup / commit and ACDE #237 agenda posting occurred simultaneously 2 minutes apart
EIP-7773 -- SFI 8 EL Amsterdam EIPs -- 8 items batch-promoted via 5/12 commit ffebcbc EIP-7708 / EIP-7778 / EIP-7843 / EIP-7954 / EIP-7976 / EIP-7981 / EIP-8024 / EIP-8037 -- single CFI → 8 SFIs within 24 hours
EIP-8037 (State Creation Gas Cost) SFI candidate 5/13 Repricings #7 Final Decision call held "Final decision" phrasing stated twice / PR #11611 + #11616 / 5 paired-spec burst commits on 5/13 13:39~16:26 UTC (2 for 8037 + 2 for 8038 + 1 EIP-7851 tweaks)
EIP-8038 (new gas repricing track) -- Entered tracking via 2 commits on 5/13 85fe207(https://github.com/ethereum/EIPs/commit/85fe2077e4498e7d5c7fcf979961ad4aac8e6fbd) "Align with 8037 and clarify spec & rationale" + 391a31b(https://github.com/ethereum/EIPs/commit/391a31b38e933a30eca4dc8ad0e26f87cd42ae88) "Quick fixes" -- paired spec with EIP-8037 / dependency, complement, or replacement TBD
200M Gas Limit Floor -- 5/12 EF blog formalized consensus ~3.3~5.6x increase versus current ~36M~60M / convergence result of ePBS + BAL + EIP-8037
ePBS (EIP-7732) multi-client devnet -- 5/12 EF blog + 5/14 ACDC #178 stable operation External block builder process effectively completed end-to-end testing across all clients / mainnet activation ETA H1 2026 → Q3 2026 becoming realistic
EIP-7928 (BAL) bal-devnet-7 spec -- 5/11 ACDT #079 confirmation stage for reflecting EIP-8037 parameter update (PR #11616) + bugfix (PR #11611) bal-devnet-7 v7.1.0 / REST SSZ EngineAPI Nethermind 5-10x performance improvement benchmark shared
EIP-8246 (Remove SELFDESTRUCT Burn) CFI (meta EIP body) 5/11 ACDT #079 discussion of inclusion in the next devnet Follow-up to favorable response at ACDE #236 (5/7) / EIP-7708 simplification effect
EIP-8254 (Cap Deposit Requests per Block) (new previous week) 8192 cap per block (5/14 ACDC #178 follow-up decision not disclosed) --
EIP-8070 / EIP-8136 dependency -- 5/11 ACDT #079 EL-independent vs CL-first disagreement EIP-8070 inclusion may be delayed
Engine API v2 + eth/70/71 -- 5/11 ACDT #079 SFI handling + execution-apis #796 (CL determines local gas limit) --

Hegotá (Codename D-Day Appearance + CL Headliner Formally Confirmed)

Item 5/11 (Mon) 5/15 (Fri) This Week's Change
"Hegotá" codename D-Day appearance on ACDE #237 agenda at 5/10 17:01 UTC (eth-magicians 28485) 5/12 EF blog phrase "Hegotá foundational work" + 5/14 ACDC #178 "hegotá" as one of two agenda items Deviation from city-name convention (Pectra/Fusaka/Glamsterdam) / etymology presumed Portuguese "already [completed/arrived]" (further verification needed) / next hard fork OR Glamsterdam follow-up stage
EIP-7805 (FOCIL) -- 5/12 EF blog + 5/14 ACDC #178 headliner reaffirmed "FOCIL is scheduled for inclusion as a headliner on the CL side" / runnable implementation complete / censorship resistance strengthened
EIP-7716 (Correlated Downtime Penalties) -- 5/14 ACDC #178 Hegotá CL candidate discussion Inclusion decision scheduled after PoC
EIP-8205 (Validator Pre-registration) -- 5/14 ACDC #178 Hegotá CL candidate discussion Development in progress
Native Account Abstraction scoping -- 5/12 EF blog "Native account abstraction requirements scoped" Possibility of defining a new Native AA line after EIP-7701 Withdrawn (merged 5/12 in the previous week)

New Governance Standardization Tracks

Item 5/11 (Mon) 5/15 (Fri) This Week's Change
EIP-8261 (Gas Limit Schedule, gpo) 5/11 15:02 UTC EIP-Idea "gpo" (eth-magicians 28494, bbusa) 5/13 official EIP-8261 number assigned 24-hour promotion / batch removal of 4 mechanisms (validator engine_forkchoiceUpdated preferred gas limit + EL --miner.gaslimit + builder bids gas_limit + EIP-1559 ±1/1024 per-block) + gpo<index> fork pattern (isomorphic to EIP-7892 BPO)
EIP-8253 (Upgrade pre-Spurious-Dragon accounts) -- 5/12 09:20 UTC new listing (eth-magicians 28505, jochem-brouwer) Replacement spec for EIP-7610 / batch bump of 24 mainnet pre-Spurious-Dragon account nonces → permanent state trie cleanup / The Purge track / Glamsterdam vs Hegota scope TBD

AA Track + ECDSA Authority Deactivation (Paired Spec Stabilization)

Item This Week's Change
EIP-8141 (Frame Transaction) 5/12 235d505 "Frames cleanup #11621" (lightclient) → 5/13 [#11652] "Support atomic batching with any frames" (Derek Chiang) -- AA UX complement by bundling multiple operations into a single transaction
EIP-8250 (Keyed Nonces for Frame Tx) 5/12 326c463 new registration -- 192-bit key + 64-bit seq 2D nonce / Vitalik endorsed it as a "potential first foray into new state scaling strategy" (previous-week tracking line)
EIP-8130 (Casper FFG simplification / presumed PQ verifier) 5/12 0aa63ce "Move from to sender" + 75eb6b4 "Add canonical verifier set" → 5/13 "Tighten verifier allowlist" + "Update gas and verifier validation" 2 commits -- yesterday's note hypothesis of a two-way AA headliner race is reinterpreted through the EF blog phrase "Native AA scoping", while EIP-8130 is a separate PQ verifier or Casper FFG simplification track
EIP-7851 + EIP-8151 (ECDSA Authority Deactivation pair) 5/13 [#11652] follow-up "simplify ECDSA authority deactivation" (colin) + 43-minute-gap EIP-8151 "align ecRecover with EIP-7851" pair alignment → 5/14 3010b58 "Few tweaks to 7851 and 8151" -- simultaneous stabilization of 3 AA tracks

Infrastructure / RPC / Other

  • EIP-7594 PeerDAS Cell-level deltas + EIP-8070 eth/72 Sparse blobpool + Ethp2p updates -- the three sessions in the newly created 5/20 P2P Networking #1 (15:30 UTC) call (eth-magicians 28500) are a signal that the specialized P2P layer track is becoming independent
  • RPC Standards #26 (5/18 15:00 UTC) newly registered (eth-magicians 28522) -- (a) eth_simulateV1 error handling relaxation, (b) debug_getRawTransaction standardization (PR #791), (c) uncle count method removal (eth_getUncleCountByBlockHash / eth_getUncleCountByBlockNumber, Breaking Change preview), (d) EIP-7910 agenda
  • EIP-8025 L1-zkEVM implementation update -- Prysm implementation progress + 7 project presentations + zkVM input deserialization at the 5/13 L1-zkEVM Breakout #004
  • ERC-8259 AI Agent Identity Draft v2 -- new at 5/13 10:26 UTC (eth-magicians 28521) / ERC for AI agent identity, reputation, and threat signals / indirect alignment with The Splurge UX track
  • BondRoute "Application-Layer Execution Bonds" -- new ethereum-magicians discussion on 5/11 / bond + slashing-based solver guarantee mechanism / critique of trust boundaries in existing MEV defenses (private mempool / relay / solver)

2. EIP Status Changes (Monday vs Friday)

Data Integrity Warning (LEVEL 3+ accumulated for 12 days): From 5/4~5/14, forkcast snapshots maintained a 246-item quota for 11 consecutive days while 1~4 EIPs rotated in/out daily (rotating snapshot drift). The EIP-5920 PAY opcode toggled 6 times over 11 days (average 1.8-day cycle). Hypothesis: the forkcast repo src/data/eips directory has more than 246 files, and a single GitHub /contents API call is truncated to the first ≈246, returning a different EIP set each day. Migration of scripts/fetch_forkcast.py to pagination (per_page=100 + page loop) or the Trees API (/git/trees/{sha}?recursive=1) has been delayed by 5 days. Forkcast citations in this section trust only results cross-verified across four sources: ACD call notes + GitHub commits + ethereum-magicians discussions + EF blog. Mainnet Final facts are unchanged (EIP-2537 / EIP-2935 Pectra Included + EIP-4844 Dencun Included remain).

5/11 → 5/15 forkcast Snapshot Toggle (Single-File Diff)

Hard Fork / Stage Added Removed
Pectra Included -- EIP-6110
Glamsterdam Declined -- EIP-6404 / EIP-6466
Glamsterdam Considered -- (1 maintained: EIP-2780) --
Fusaka Declined -- (5 maintained: 5 EOF items) --
Dencun Included -- (1 maintained: EIP-4844) --

The single-date diff looks small, but the daily toggle pattern was violent (5/11 EIP-4750/6110/6404/6466 returned + 6206 disappeared → 5/12 6110 disappeared again + 5920 appeared on both sides → 5/13 5450+5920 disappeared simultaneously + EOF 5 items → narrowed to 4 items → 5/14 5920/6466 both returned + 3-item window re-expanded). Looking only at diffs between the two ends of each week captures less than 1/10 of the truncate-window deviation. It must be read together with the daily toggle matrix (see daily briefing section) to be coherent.

Trustworthy Changes (Calls / Commits / EF Blog 4-way Cross-verification)

EIP-7773 Glamsterdam Meta SFI Promotion of 8 Items (5/12 commit ffebcbc)

  • EIP-7708 (ETH transfer logs) -- impact on standardizing Lido contract stETH transfer events
  • EIP-7778 (Block Gas Accounting without Refunds) -- direct impact on MEV builder/relay revenue models through removal of gas refunds
  • EIP-7843 (SLOTNUM opcode) -- exposes slot number to the EVM
  • EIP-7954 (Maximum Contract Size increase) -- candidate impact on stETH contract upgrades (current limit 24,576 bytes)
  • EIP-7976 (Calldata Floor Cost increase) -- strengthens blob usage incentives
  • EIP-7981 (Access List Cost increase)
  • EIP-8024 (SWAPN/DUPN/EXCHANGE backward-compatible)
  • EIP-8037 (State Creation Gas Cost Increase) -- 5/13 Repricings #7 Final Decision track

New Registration / Official Number Assignment

  • EIP-8253 (Upgrade pre-Spurious-Dragon accounts, 5/12 09:20 UTC, jochem-brouwer) -- replacement for EIP-7610 / The Purge
  • EIP-8261 (Gas Limit Schedule gpo, official number assigned 5/13 / posted as an EIP-Idea on 5/11) -- removes 4 mechanisms
  • EIP-8038 (paired spec, entered commit tracking on 5/13) -- "Align with 8037" message
  • EIP-8141 (Frame Transaction, atomic batching added 5/13)
  • EIP-8250 (Keyed Nonces, 5/12 commit 326c463)

Status / Meta EIP Body-level Listings

  • EIP-7805 (FOCIL) -- Hegota CL Headliner formally confirmed (5/12 EF blog + 5/14 ACDC #178)
  • EIP-7716 / EIP-8205 -- entered as Hegota CL candidates (5/14 ACDC #178)
  • EIP-8246 -- listed as CFI in the EIP-7773 Meta (5/10 e88ce59)
  • EIP-8037 / EIP-8038 -- Final Decision decision call (5/13 Repricings #7)
  • ERC-4337 -- Last Call (entered D-4 to possible 5/19 Final point, previous-week track)

3. Validator / Infrastructure Key Issues

5 Lido May 2026 Snapshots Proposed Simultaneously (5/13 11:10 UTC) -- Peak Governance Standardization Day

SSV Community NO ICS Framework Additional Scoring Proposal (5/13 14:06 UTC) -- DVT Permissionless-Entry Acceleration Track

  • Lido Research 11559 (GBeast). Original quote: "Add a new score source: SSV pre-VO KYC to Proof of Humanity category [4 points] / Add a new score source: SSV High Signal score to Proof of Engagement [2 - 5 points]".
  • Across the three stages ICS (Identified Community Staker) / VO (Verified Operator) / CSM (Community Staking Module), SSV community NOs obtain ICS eligibility faster through their own KYC bonus and operational reliability bonus. This leads to Lido NO pool decentralization + lower dependence on permissioning + improved DVT operator ROI.
  • First visibility of the Lido NO pool's triple-track governance structure: (a) Curated Module v2 (permissioned + Type Assessment Framework standardization), (b) CSM-ICS (permissionless score accumulation + DVT acceleration), (c) SDVT (permissioned DVT) = new NO entrants can choose the track that matches their infrastructure/organizational structure.

Existing A41 / SSV DVT Tracks + Remaining EarnETH Incident

  • Previous week's 5/7 A41 ~7,000 validator Exit case study (Lido X 7-tweet campaign) entered full amplification stage this week = Curated Operator wind-down SOP 4.4x reduction (Organic 78 ETH → Scheduled/Batched 17.64 ETH) standardization material is now available for cumulative use in the weekly narrative.
  • SSV Network Anchor client Lido mainnet recommendation (previous week 5/4) naturally aligns with this week's SSV Community NO ICS framework proposal = SSV track expands bidirectionally through Curated Module + Simple DVT Module mainnet recommendation + permissionless CSM track acceleration.
  • EarnETH Vault withdrawal halt, day 22 (as of 5/14, D+7 static) -- freeze started 4/22 / "in the near future" (5/7 Lido X) ETA static at D+7 / entering the limit as the second week of May close (5/16) approaches / 5/15 (Fri) Lido content-cycle next-announcement candidate window + possible EarnETH ETA alignment (not disclosed at the time of this report).
  • Lido Tokenholder Update Call (5/21 14:00 UTC) pre-announced at Lido Research 11551 / lineup @_vshapovalov + @zuzu_eeka + @IsdrsP (Chief of Staking). It conflicts with ACDE #237 (90 minutes) in the same 14:00 UTC time slot, so monitoring the presentation order is key.
  • Credora @bvicentes stETH resilience amplification (5/13 15:52 UTC) distributed via a Lido X Poolside Institutional full video the analysis that "stETH has superior resilience versus recent DeFi exploit waves through 1:1 algorithmic minting + industry-leading timelock protection." It pushed the institutional narrative and governance narrative simultaneously.

EL Peer Composition Drift Week-2 Measurement -- Quantitative Exposure of Client Diversity Metric Limits

  • Stereum Labs 36-node fleet analysis (5/12 12:13 UTC, stefa2k). On the same EC/CC + same hardware + same Reth release baseline: (a) Besu node Reth peer concentration ~75% → ~96% (+21%p / week 2), (b) ~96% versus Reth network share of ~12% = ~8x asymmetric over-representation, (c) Reth fleet connected peer ~123 → ~69 (-44%), (d) Reth fleet tracked peer table ~7,400 → ~2,506 (-66%).
  • Implication: standard client diversity metrics (node-count ratio / clientdiversity.org) only partially reflect actual P2P topology safety, so peer-link-unit entropy measurement is needed. Besu operator P2P isolation risk arises at 96% Reth peer concentration. If a Reth client bug occurs, the Besu fleet could also be affected, partly neutralizing the original purpose of client diversity.
  • It potentially aligns with the 5/20 P2P Networking #1 call agenda (Cell-level deltas + Sparse blobpool + Ethp2p), and could become a core follow-up discussion call.

Continuing Client / Infrastructure Risks

  • EL/CL client release gap at day 45: Geth v1.17.2 (CVE-26313/26314/26315 RPC + debug_executionWitness state corruption) + Lighthouse v8.1.3 (state root 10x regression + P2P security) CRITICAL advisories unresolved for 45 days. 5/5 Nethermind v1.37.2 (Breaking eth/66/67 drop) + 4/30 Reth v2.2.0 (Discv5 enabled by default) major changes remain cumulatively static.
  • 200M Gas Limit Floor consensus + ePBS multi-client verification complete means a ~3.3~5.6x increase versus current ~36M~60M. Curated Operators should set a 6~12 month ETA for CPU/RAM/NVMe SSD/network upgrades. If EIP-8261 (gpo fork pattern) activates, gas-limit decision authority is standardized from NOM governance into the ACD cycle.

4. Protocol Call Key Decisions

Source: output/notes/protocol-calls/2026-05-15-weekly-call-summary.md (7 total calls, 0 official notes published, organized from agendas and context)

This Week's Call List (Total 7)

Date Call Number Key Topic Status
5/11 (Mon) 14:00 UTC ACDT — All Core Devs Testing #079 Interop result sharing / Glamsterdam devnet-1 spec / EIP-8246 devnet inclusion discussion / EIP-7928 BAL-devnet-7 confirmation / EIP-8070 vs EIP-8136 dependency / eth/70 eth/71 SFI / REST SSZ EngineAPI 5-10x Notes unpublished
5/12 (Tue) 12:00 UTC FCR — Fast Confirmation Rule #007 Client / Spec / Research / Testing updates Notes unpublished
5/13 (Wed) 13:00 UTC PQTS — Post Quantum Tx Signature #008 conduition presentation "Pruning Hypertrees for the Lax and Lazy" Notes unpublished
5/13 (Wed) 14:00 UTC Glamsterdam Repricings #007 EIP-8037 Final Decision (PR #11611 + #11616) + bal-devnet-7 v7.1.0 + EIP-2780 TX_BASE_COST benchmarking + EIP-8038 devnet inclusion Notes unpublished
5/13 (Wed) 14:00 UTC PQI — Post-Quantum Interop #039 Devnet-5 direction / 3SF mini vs Goldfish / leanSpec stabilization / cryptography-specs Notes unpublished
5/13 (Wed) 15:00 UTC L1-zkEVM Breakout #004 EIP-8025 Prysm implementation update + 7 project presentations + zkVM input deserialization Notes unpublished
5/14 (Thu) 14:00 UTC ACDC — All Core Devs Consensus #178 glam + hegotá 2-item agenda / EIP-7805 FOCIL Hegotá CL Headliner reaffirmed / EIP-7716 / EIP-8205 candidate discussion Notes unpublished

Note: 4 calls on a single date, 5/13 (Wed), with 2 simultaneous starts at 14:00 UTC and 2 simultaneous starts at 15:00 UTC = peak listener fragmentation. ACDE call absent (next ACDE #237 is 5/21).

Key Decision Summary

  1. ACDC #178 is the official starting point of the Glamsterdam → Hegotá transition. The agenda structure itself was split into two items ("glam" + "hegotá"), and EIP-7805 FOCIL was effectively reaffirmed as the Hegotá CL headliner. EIP-7716 (Correlated Downtime Penalties, inclusion after PoC) + EIP-8205 (Validator Pre-registration, development in progress) Hegotá CL candidates were also discussed in earnest, resolving the 27-day ACDC non-registration critical path.

  2. ACDT #079 is the Glamsterdam devnet-1 + bal-devnet-7 confirmation stage. It covered the Interop event (4/24~30) result summary, discussion of including EIP-8246 (Remove SELFDESTRUCT Burn) in the next devnet (follow-up to favorable ACDE #236 response), EIP-7928 BAL-devnet-7 v7.1.0, reflecting EIP-8037 PR #11616/#11611, REST SSZ EngineAPI Nethermind 5-10x performance improvement, and the proposal for the CL to determine the local gas limit (execution-apis #796). The EIP-8070 vs EIP-8136 dependency remains unresolved.

  3. Repricings #7 is the decision call for EIP-8037 spec freeze. The agenda stated the phrase "Final decision" twice. The key items were a bal-devnet-7 (v7.1.0)-based single cost parameter, direct benchmarking of EIP-2780 TX_BASE_COST, and whether to include EIP-8038 in the devnet. Official notes are unpublished, but a 5-commit burst in the 13:39~16:26 UTC window (2 for 8037 + 2 for 8038 + 1 for 7851) is an alignment signal for the presumed merge of PR #11616 + #11611 and the spec-freeze result.

  4. Cumulative 14 unpublished official notes (D+1 ~ D+57) -- ACDC #176 (D+57) / ACDE #233 (D+50) / ACDE #234 (D+36) / ACDC #177 (D+29) / ACDE #235 (D+22) / PQI #038 (D+9) / ACDE #236 (D+8) / ACDT #079 (D+4) / FCR #007 (D+3) / PQTS #008 (D+2) / Repricings #007 (D+2) / PQI #039 (D+2) / L1-zkEVM #004 (D+2) / ACDC #178 (D+1). The key monitoring point is whether the official-note publication delay is resolved in batch during the 5/18 (ACDT #080) or 5/21 (ACDE #237) window.


Daily Recommendations (Topic Recommender)

Date Recommendation 1 Recommendation 2 Score
5/11 'Hegotá' new codename + ACDE #237 90-minute agenda -- simultaneous decision call for two hard forks + deviation from city-name convention CFI in the Meta EIP body vs forkcast Considered -- Glamsterdam governance-alignment structure through the EIP-7773 → EIP-8246 CFI case + The Purge SELFDESTRUCT cleanup track 0.902 / 0.898
5/13 EIP-8261 (Gas Limit Schedule) 24h promotion -- simultaneous removal of 4 tracks: validator preferred gas limit + EIP-1559 ±1/1024 + EL --miner.gaslimit + builder bids gas_limit 36-node fleet 2-week P2P drift measurement -- Besu→Reth ~75% → ~96% + blind spot in standard client-diversity metrics + peer-link entropy monitoring paradigm 0.87 / 0.86
5/14 Lido May 2026 Snapshot 5 D-4 -- CMv2 NO Type Assessment Framework + GateSeals→CircuitBreaker + Pier Two/MAVAN re-approval + 5/18~5/21 7-day governance-peak window SSV Community NO ICS framework additional scoring -- DVT operator ROI equation + first visibility of Lido NO pool triple-track (Curated v2 / CSM-ICS / SDVT) governance structure 0.92 / 0.91

Priority Drafting Targets (Top 3)

  1. [5/14 Recommendation 1, score 0.92] Lido May 2026 Snapshot 5 D-4 -- CMv2 NO Type Assessment Framework Standardization + GateSeals → CircuitBreaker Permanence -- category: issue, length 4,500~5,500 characters.

    • Reason: (i) secures a solo insight window 4 days before the deadline in the concentrated 7-day governance window from 5/13 proposal → 5/18 16:00 UTC batch close → 5/21 14:00 UTC Tokenholder Call (0 external media analyses), (ii) if the CMv2 NO Type Assessment Framework passes, formal standardization of Curated Operator entry assessment criteria and entry-material v2 drafting ETA 5/18~5/21, (iii) GateSeals → CircuitBreaker permanence lets the institutional operational-risk simplification narrative be integrated into the package of 4 external attestations (StakingRewards A+ + Credora A+ + Bluechip A+ + Cantina Web3SOC) + 3 custody providers (BitGo + Fireblocks + Copper).
    • Differentiation: 0 Korean materials + 0 standalone English analyses after the 5/13 proposal + integrated narrative analysis of the May governance burst.
  2. [5/14 Recommendation 2, score 0.91] SSV Community NO ICS Framework Additional Scoring -- DVT Operator ROI Equation + First Visibility of Lido NO Pool Triple-Track Governance Structure -- category: article, length 5,000~6,000 characters.

    • Reason: A solo insight window opened because there were 0 external responses/comments as of 2 days after GBeast posted Lido Research 11559 on 5/13 14:06 UTC. Formal listing of the accelerated Lido CSM/ICS entry track for DVT (SSV) operators is the first case where DVT infrastructure investment directly converts into Lido entry bonus points. Visualization of the Lido NO pool triple-track structure (Curated v2 / CSM-ICS / SDVT) is absent in both Korean and English.
    • Differentiation: Can be structured as a series with Recommendation 1 (Recommendation 1 is governance standardization, Recommendation 2 is the DVT permissionless-entry track; together they form the Lido NO pool triple structure).
  3. [5/11 Recommendation 1, score 0.902] 'Hegotá' New Codename + ACDE #237 (5/21, D-6) 90-minute Agenda -- category: issue, length 4,500~5,500 characters.

    • Reason: The codename's position (next hard fork) was formally confirmed by the 5/12 EF blog phrase "Hegotá foundational work" and the 5/14 ACDC #178 "hegotá" agenda entry. The 5/21 ACDE #237 D-6 point maximizes advance-coordinate value and enables a follow-up comment note publication plan before/after the decision call. Deviation from city-name convention + AA track unification decision + Glamsterdam CFI/Considered candidate batch-decision scenario.
    • Differentiation: 0 Korean analyses + evaluation of the effect of AA track unification on Lido validators (key management and delegation structure).

Series Continuity Recommendation: Build a serial series with Recommendation 1 (governance standardization) + Recommendation 2 (DVT permissionless-entry track), and explicitly link it to the 5/9 Lido EEA Treasury 5-way due-diligence package narrative to secure series continuity. The 5/18 Snapshot result + 5/21 Tokenholder Call result naturally align as v2 update windows for these recommended articles.


6. Next Week's Major Schedule (2026-05-18 ~ 2026-05-22)

Protocol Calls

Date Call Number Key Observation Point
5/18 (Mon) 14:00 UTC ACDT — All Core Devs Testing #080 (estimated) Glamsterdam devnet updates + spec next devnet / whether EIP-8246 devnet-1 inclusion is confirmed / reflection of EIP-8037 Final Decision result / bal-devnet-7 official launch ETA
5/18 (Mon) 15:00 UTC RPC Standards #026 eth_simulateV1 error handling relaxation + debug_getRawTransaction standardization (PR #791) + uncle count method removal (Breaking Change preview) + EIP-7910 agenda
5/20 (Wed) 15:30 UTC P2P Networking #001 (new) Cell-level deltas (@MarcoPolo / PeerDAS) + Sparse blobpool (@healthykim, @kamilsa / EIP-8070 eth/72) + Ethp2p updates (@raulk) -- possible core follow-up call for EL peer drift
5/21 (Thu) 14:00 UTC ACDE — All Core Devs Execution #237 (90 minutes) Agenda "Glam + Hegotá" -- final decision moving 8 SFI EIPs Scheduled → Included + official disclosure of Hegotá definition + AA track unification (EIP-8141 vs EIP-8130 vs EIP-7851/EIP-8151)
5/26 (Tue) FCR — Fast Confirmation Rule #008 (estimated) Client / Spec / Research / Testing updates

Devnet / Spec Milestones

  • Whether Glamsterdam devnet-1 launches immediately after 5/18 ACDT #080 -- bal-devnet-7 v7.1.0 + EIP-8037 Final Decision result reflected
  • bal-devnet-7 → bal-devnet-8 transition -- whether EIP-8038 is included in the devnet + EIP-2780 TX_BASE_COST benchmarking result
  • Whether PQ Devnet-5 proceeds -- PQI #039 (5/13) result undisclosed / awaiting conclusion on 3SF mini vs Goldfish

Governance / Operations

  • 5/18 16:00 UTC batch close of 5 Lido Snapshots -- CMv2 NO Type Assessment Framework + GateSeals → CircuitBreaker + Pier Two/MAVAN re-approval + NEST LDO buyback + LOL Easy Track limit. If passed, entry-material v2 drafting ETA 5/18~5/21.
  • 5/19 ERC-4337 possible Final point -- Last Call 14-day window ends (previous week 5/5 → 5/19). Monitor PR #1640 merge timing.
  • 5/21 14:00 UTC ACDE #237 + Lido Tokenholder Update Call simultaneous progress -- same-time-slot conflict. Lido lineup @_vshapovalov + @zuzu_eeka + @IsdrsP (Chief of Staking) / four scenarios for "what's next" phrasing = (a) next institutional ETH treasury case, (b) new Curated Operator vacancy/rotation, (c) V3 stVaults progress, (d) NOM governance change.
  • EarnETH Vault freeze release ETA -- "in the near future" D+8 (as of 5/15) / presumed limit for ETA disclosure before entering week 4 (5/19).

Official Note Publication Delay Batch Resolution Monitoring

ACDC #176 (D+57) / ACDE #233 (D+50) / ACDE #234 (D+36) / ACDC #177 (D+29) / ACDE #235 (D+22) / PQI #038 (D+9) / ACDE #236 (D+8) / ACDT #079 (D+4) / FCR #007 (D+3) / PQTS #008 (D+2) / Repricings #007 (D+2) / PQI #039 (D+2) / L1-zkEVM #004 (D+2) / ACDC #178 (D+1) -- possibility of batch publication immediately after the 5/18~5/21 call window. Immediately read the full text of the Repricings #007 EIP-8037 Final Decision result + ACDC #178 Hegotá scoping consensus.

Technical Risk Monitoring

  • Client release gap day 45 → entering the 50-day range -- nodes with unresolved Geth v1.17.2 + Lighthouse v8.1.3 CRITICAL advisories need immediate patching or external RPC deactivation. After ACDT #080 (5/18), monitor GitHub Releases for EL/CL releases supporting Glamsterdam devnet-1 (EIP-8037/EIP-7928 BAL/EIP-8246 implementation tags).
  • EIP upgrade status (forkcast) data integrity LEVEL 3+ accumulated for 12 days -- migration of scripts/fetch_forkcast.py to pagination or Trees API is delayed by 5 days / directly count actual file count in forkcast repo src/data/eips directory (hypothesis 300~500).
  • EL peer composition drift monitoring -- Besu operators should immediately check admin_peers or metrics SOP / take peer-diversity measures if Reth peer ratio is 80%+. Monitoring the 5/20 P2P Networking #1 result is key.

EIP-1559, EIP-2780, EIP-4844, EIP-5920, EIP-6110, EIP-6404, EIP-6466, EIP-7251, EIP-7594, EIP-7610, EIP-7708, EIP-7716, EIP-7732, EIP-7773, EIP-7778, EIP-7805, EIP-7843, EIP-7851, EIP-7892, EIP-7910, EIP-7928, EIP-7954, EIP-7976, EIP-7981, EIP-8024, EIP-8025, EIP-8037, EIP-8038, EIP-8070, EIP-8130, EIP-8136, EIP-8141, EIP-8151, EIP-8205, EIP-8246, EIP-8250, EIP-8253, EIP-8254, EIP-8259, EIP-8261.


Reference Sources

Daily Briefings

  • 2026-05-11 Daily Briefing -- ACDE #237 (5/21, D-10) "Glam / Hegotá" 90-minute agenda disclosed + EIP-7773 CFI EIP-8246 official listing
  • 2026-05-12 Daily Briefing -- Svalbard Interop official wrap-up (EF blog ends 9-day hiatus) + EIP-7773 SFI promotion of 8 EL EIPs + EIP-8261 (gpo) new proposal + Lido Tokenholder Call (5/21) announcement
  • 2026-05-13 Daily Briefing -- Glamsterdam Repricings #7 D-Day + EIP-8037 Final Decision + 5 calls on a single date + official numbers for EIP-8253 / EIP-8261 + EL peer drift 36-node fleet measurement
  • 2026-05-14 Daily Briefing -- Repricings #7 D+1 paired-spec burst of 5 commits + Lido May 2026 Snapshot 5 D-4 + SSV Community NO ICS framework newly listed + RPC Standards #26 (5/18 uncle method removal agenda)

Protocol Calls / Recommendations

Core External Sources

Previous Weekly Report

  • 2026-05-08 Weekly Report -- Lido institutional due-diligence full-stack lifecycle + Glamsterdam SFI 8 EIPs (ACDE #236) + The Purge decision-pressure peak (5/7 trio)

Written by: @r2jamong | 2026-05-15 (Friday ACDC #178 D+1 · weekly synthesis report · ACDE #237 D-6 · Lido Snapshot 5 close D-3 · Lido Tokenholder Update Call D-6)